Steel Slag Crushing Solutions

Brief Information

Raw Material:Steel Slag

Capacity:15-180t/h

End Products: 0-12mm

Key Equipment

The steel slag  crushing plant programme needs to consider the crushing efficiency, metal recovery rate, energy consumption and environmental protection requirements. The following is a summary of the technical solutions after integrating the information from various sources:

Process Flow Design

Tertiary crushing + Screening process

Rough crushing stage: Jaw crusher (e.g. PE series) is used to deal with large steel slag (≤300mm), and the discharge size is controlled at 150-300mm.

Medium crushing stage: Impact crusher for secondary crushing, discharge size ≤ 50mm.

Fine crushing stage: Roll crusher crushes the material to ≤5mm, realising efficient dissociation of slag and iron.

Screening and Magnetic Separation: Vibrating screen with three levels of screening (coarse, medium and fine).  Combined with permanent magnetic drum and cartridge magnetic separator to recover metallic iron and reduce.  The metal content in the tailings to less than 1%.

Core equipment configuration

Jaw crusher × 2 (coarse crushing) Cone crusher × 1 (medium crushing) Roll crusher × 1 (fine crushing) Vibrating screen × 3 (screening) High-efficiency dust collector × 1 (dust control)

Crushing equipment selection key points

Coarse crushing equipment

Jaw crusher

Jaw crusher

Jaw crusher:  Large processing capacity, capable of crushing large steel slag over 300mm, matching with secondary crushing.

Impact crusher

Impact crusher

Impact crusher: adjustable fineness of discharged material (≤50mm), suitable for aggregate production, but sensitive to iron content.

Fine crushing equipment

Roll crusher

Roll crusher

Roll crusher: metal iron recovery rate increased to more than 95%, can achieve efficient dissociation of slag iron, tailings metal iron content ≤ 1%, energy consumption is 30% lower than traditional equipment.

Advantages of steel slag crushing programme

Through three-stage crushing + four magnetic separation (suspended magnetic, cylinder magnetic separator, etc.), large slag steel (TFe>80%), particle steel (TFe 60-85%), fine powder (TFe 30-60%) can be recovered. The metal iron content of tailing slag is ≤1%, which meets the standard of building material aggregate (e.g. concrete aggregate needs to be ≤5mm).

Energy saving and environmental protection

Adopt ‘more crushing and less grinding’ process to reduce the energy consumption of grinding (steel slag Bond Index 20-30kW-h/t). Equipped with pulse dust collector (dust concentration ≤20mg/m³) and soundproof cover, in line with environmental emission standards.

 

LEAVE message

Welcome to consult us at any time, we will be the first time to reply!

     

      Online
      Whatsapp
      +86-18339818180
      Wechat
      +86-18339818180
      Inquiry